GAITE was founded, entering the washing machine components industry.
ODM Washing Machine Synchronizer
-- Steady & Reliable Manufacturer --
Overview
ODM washing machine synchronizer development starts from the buyer's target cycle sequence, such as when the wash-to-spin transition should occur or how drum reversal should be timed, and results in a cam profile and timing mechanism engineered specifically for that program.
This tag is for buyers who know how their wash cycle should behave but do not have an existing synchronizer drawing, and who want the timing mechanism developed from that cycle sequence.
Washing Machine Transmission Components
Gear reducers, P-shafts and synchronizers for OEM manufacturers and the aftermarket.
-
Washing Machine Transmission
The Washing Machine Transmission is the core power unit of semi-automatic agitator washing machines,...
View Details → -
Washing Machine Gear Case
The Washing Machine Gear Case is a key transmission component of semi-automatic agitator washing mac...
View Details → -
Twin-tub Washing Machine Reducer
The Twin-tub Washing Machine Reducer is the core power device of semi-automatic twin-cylinder washin...
View Details → -
Semi-auto Washing Machine Gear Box
The Semi-auto Washing Machine Gear Box is an important transmission component of semi-automatic agit...
View Details → -
Semi-Automatic Twin-Tub Washing Machine Gearbox
This is a straight-through pulsator shaft assembly for semi-automatic twin-tub washing machines with...
View Details →
Specification
| Parameter | Typical Range / Option |
| Development Basis | Target cycle sequence and timing requirements for the wash program |
| Timing Mechanism | Cam-based mechanical or electromechanical, selected during the design stage |
| Housing Material | Selected based on mounting space and cost target |
| Development Process | Cycle sequence review, cam profile design, prototype sample, validation, mass production |
| Design Ownership | Confirmed with the buyer at the start of the project |
| Certification | ISO9001, ISO14001, RoHS on request |
| Packaging | Anti-static bag, export carton, pallet for bulk orders |
| Customization | Timing points and cam profile developed to the stated cycle sequence |
Application
- Suitable for: buyers who know how their wash cycle should behave but do not have an existing synchronizer drawing.
- Suitable for: appliance manufacturers developing a new wash program with timing requirements not met by an off-the-shelf synchronizer.
- Suitable for: projects developing a synchronizer alongside a newly designed gearbox for the same platform.
- Not recommended for: buyers who already have a drawing or sample of a working synchronizer they simply want reproduced; the OEM Washing Machine Synchronizer tag is faster and lower cost for that case.
Advantages
- Cycle-led design: cam profile and timing points are engineered around the buyer's stated wash program rather than adapted from an unrelated existing design.
- Coordinated with gearbox development: synchronizer design can be developed alongside a matched gearbox project for the same platform.
- Structural flexibility: mechanical cam-based or electromechanical timing can both be considered during the design stage.
- Exclusive design potential: a newly developed timing sequence can be positioned as exclusive to the commissioning buyer, subject to project agreement.
- Full development support: the process moves through cycle sequence review, cam design, and validation before mass production begins.
Payment and Shipping
| Item | Detail |
| Payment Terms | T/T or L/C, confirmed at the project quotation stage |
| Sample Lead Time | Typically 15 to 20 days for a new cam-based sample, depending on complexity |
| Mass Production Lead Time | Set after sample approval and any design revisions are finalized |
| Order Quantity | Development is generally paired with a projected production volume discussed at the proposal stage |
| Shipping Method | Sea freight for bulk cargo, air freight for samples or urgent orders |
| Export Packaging | Moisture-proof inner packing, export carton, palletized for bulk shipment |
To start an ODM inquiry, describe your target cycle sequence and share the paired gearbox specification if one is already defined. A technical response with a proposed development plan is typically provided within two to three business days.
Frequently Asked Questions
- Q: What information is needed to begin an ODM synchronizer project?
- A: The target cycle sequence, including when direction changes or the wash-to-spin transition should occur, is the main input used to start the design stage.
- Q: Can the synchronizer be developed together with a new gearbox?
- A: Yes, synchronizer and gearbox can be developed as a coordinated project when both are needed for the same platform.
- Q: Is a new mold required for a new synchronizer design?
- A: A new mold is generally required when the housing shape does not match existing tooling; the engineering team confirms this after reviewing the requirement.
- Q: Who owns the resulting timing design?
- A: Design ownership terms are discussed and confirmed with the buyer at the start of the project.
- Q: How long does a full ODM synchronizer development cycle take?
- A: Timing depends on complexity, but a new cam-based sample is typically ready in 15 to 20 days from the start of the design stage.
Related Categories
Transmission Systems
Founded in 2002, GAITE is located in Ningbo, Zhejiang, with convenient transportation and a strategic location. The company specializes in the R&D and manufacturing of core washing machine components, including gear reducers and synchronizers, widely used by OEM manufacturers and the aftermarket.
With years of development, GAITE now operates a modern production base of approximately 10,000 m², supported by stable production capacity and mature manufacturing processes. Committed to quality, GAITE continuously optimizes product performance and structural design, providing customers with cost-effective component solutions.
Development Goal
To focus on the core washing machine components sector, continuously enhance product quality and manufacturing capabilities, and steadily grow into a leading player in the niche market—becoming a long-term trusted partner for customers.
Mission
GAITE is committed to a customer-oriented approach, driven by technological innovation and built on consistent quality, continuously improving product competitiveness and service capabilities.
We advocate a pragmatic and efficient work style, value teamwork and long-term development, and strive to build stable, trust-based partnerships with customers for mutual growth and shared success.
GAITE has obtained ISO 9001 Quality Management System and ISO 14001 Environmental Management System certifications, establishing a comprehensive and standardized management framework across production and operations.
Our products comply with RoHS requirements, with strict control of hazardous substances to ensure safety, environmental responsibility, and reliability—meeting international market standards.
-
0 + year
Industry Experience
-
0 m²
Factory Area
-
0+
Number of Employees
-
>0units/year
Annual Production Capacity

Counts
-
022002
-
122012
Established a partnership with Sharp Corporation.
-
132013
Partnered with Panasonic Corporation.
-
212021
Built a long-term partnership with Midea Group.
-
-
Our Factory
GAITE operates a production base of approximately 10,000 m², with around 90% of core materials produced in-house, ensuring product consistency and stable supply.
Read More
English
عربى























+86-574-63256717 /63267914
info@gaite.cn
gaite@gaite.cn
No. 208 Miaoshan Road, Shiyan Village, Henghe Town, Cixi City, Ningbo City, Zhejiang Province, China